For the complete documentation index, see llms.txt. This page is also available as Markdown.

COM7 Module Test Jig Setup

Prepared by Lior Jigalo

Carrier panel connectors

  1. Connect an Ethernet cable into the Ethernet switch and attach it to the carrier.

  2. Connect the test image USB Thumb drive to the front USB 3.0 interface.

  3. Connect 1x USB 3.0 thumb drive to the front USB 3.0 interface.

  4. Connect 2x SFP DAC cables to the switch.

  5. Connect the USB 3.0 splitter to the USB 3.0 header

  6. Connect 2x USB 3.0 thumb drives to the splitter

  7. Connect the USB 2.0 splitter to the USB 2.0 header

  8. Connect 2x USB 2.0 thumb drives to the splitter

  9. Connect an NVME drive to the carrier

  10. Attach an x8 PCIE device to the PCIE connector

Last updated